Enhancing Electric Grid Resilience Act

United States119th CongressHR-9843House of Representatives
Latest legislative activity: Jul 22, 2026

Summary

AI Summary

This bill, known as the Enhancing Electric Grid Resilience Act, amends the Federal Power Act to establish a framework for allocating the costs of specific electric power transmission facilities. It introduces the concept of a "transmission facility of national significance," which includes new interstate or offshore electric power transmission lines with a capacity of at least 1,000 megawatts, or expansions that increase capacity by at least 500 megawatts, provided construction is completed after the bill's enactment.

Under this new section, entities proposing such facilities can file tariffs with the Federal Energy Regulatory Commission (FERC) to allocate costs. FERC is mandated to ensure that these costs are allocated to customers within the relevant transmission planning region(s) in a manner roughly commensurate with the estimated anticipated benefits. These benefits encompass a broad range, including reliability, economic advantages, public policy goals, and enhanced resilience of the electric grid.

Automatically generated; check the official text for authoritative details.

Bill texts

Available versions
Introduced (House)View official text

1 version available

All available records shown.

Timeline

Latest companion bill action

S-5074: Enhancing Electric Grid Resilience Act

Introduced in Senate

  1. Introduced in House

  2. Referred to the House Committee on Energy and Commerce.

    House of Representatives

All available records shown.