To direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes.
United States119th CongressHR-8113House of Representatives
Updated: Mar 26, 2026
Summary
This bill mandates the Secretary of the Interior, through the Commissioner of Reclamation, to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam. The primary objectives of this system are to optimize hydropower generation by releasing cold water and to prevent the entrainment of invasive species , aligning with existing environmental plans. The study requires consultation with the Secretary of Energy and Colorado River Storage Project power contractors, and it must include all necessary hydrological modeling. If the Secretary determines a system is feasible and the power contractors concur, construction of the chosen alternative may proceed. The feasibility study must be completed within 18 months of the bill's enactment, with its costs covered by appropriated federal funds that are nonreimbursable. Importantly, this legislation explicitly states that it does not affect the post-2026 Colorado River reservoir operations guidelines.
Bill texts
All available records shown.
Timeline
Latest companion bill action
S-3743: A bill to direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes.Committee on Energy and Natural Resources. Reported by Senator Lee with an amendment in the nature of a substitute. Without written report.
Introduced in House
Referred to the House Committee on Natural Resources.
House of Representatives
All available records shown.