(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.) (Sec. 1) This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the W. Kerr Scott Hydropower Project located on the Yadkin River in Wilkes County, North Carolina. Additionally, FERC may reinstate the construction license if it is expired.
Administrative law and regulatory proceduresAlternative and renewable resourcesDams and canalsElectric power generation and transmissionFederal Energy Regulatory Commission (FERC)Licensing and registrationsNorth Carolina
A bill to extend the deadline for commencement of construction of a hydroelectric project.
USA115th CongressS-723| Senate
| Updated: 5/24/2017
(This measure has not been amended since it was introduced. The summary has been expanded because action occurred on the measure.) (Sec. 1) This bill authorizes the Federal Energy Regulatory Commission (FERC), upon request, to extend by six years the time period during which construction must commence on the W. Kerr Scott Hydropower Project located on the Yadkin River in Wilkes County, North Carolina. Additionally, FERC may reinstate the construction license if it is expired.
Administrative law and regulatory proceduresAlternative and renewable resourcesDams and canalsElectric power generation and transmissionFederal Energy Regulatory Commission (FERC)Licensing and registrationsNorth Carolina